Santee Cooper Electric Power Project | History of SC Slide Collection

The Santee Cooper electric power project begun during the New Deal was promoted by Governor Ibra Charles Blackwood (see Ibra Charles Blackwood). The power-house site for the dam is shown here under construction in 1939.

Courtesy of the South Caroliniana Library.

More in this Series

History of SC Slide Collection / E. Economic Activity in South Carolina | History of SC Slide Collection / J. Power Plants

Charcoal Burners | History of SC Slide Collection

Photo

Grades

  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
Charcoal Burners | History of SC Slide Collection
Episode 1
Charcoal burners, near the Francis Marion National Forest. The photograph of the charcoal operation of Mr. J.W. Litchfield near the Rotten Egg Savannah Road, "shows practically the complete operation...
Water Power | History of SC Slide Collection

Photo

Grades

  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
Water Power | History of SC Slide Collection
Episode 2
Water power was an important resource for early industry in South Carolina. This mill south of Columbia created a mill pond where the state fair grounds are now located. The presence of the mill and...
Falling Water | History of SC Slide Collection

Photo

Grades

  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
Falling Water | History of SC Slide Collection
Episode 3
Falling water remained an important source of power for the growing textile industry in South Carolina in the late 19th and early 20th centuries. Here the Saluda River Dam in Greenville harnesses the...
Summer Nuclear Plant | History of SC Slide Collection

Photo

Grades

  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
Summer Nuclear Plant | History of SC Slide Collection
Episode 8
Aerial view of the Summer Nuclear Plant, located near Columbia and operated by SCE&G. It was completed in 1984 as an alternative to water or coal generated production to meet growing demands for...